What Are The Precautions For Environmental Protection Acceptance For Construction Projects Involving The Renovation Of Old Barrels?
2. On-site investigation
①Contrasting with the EIA report and approval documents, verify on-site whether the actual construction content, production scale, production process, product plan, raw and auxiliary materials, production equipment, site selection, and number of personnel of the project are consistent with the EIA, and whether the layout of the plant is consistent; Changes should be analyzed whether they constitute major changes, and if not involved, the reasons for the changes and the circumstances of the changes should also be recorded.
②Waste water, waste gas, solid waste production link, production volume, whether the specific pollutants have changed; whether the pollution prevention measures are consistent, what are the changes, whether the prevention measures are accepted and the test operation analysis is up to the standard discharge (at the same time record the points that need to be monitored and the pollution ); Whether the size, location, storage volume, and usage of the temporary solid waste storage facilities are consistent with the environmental assessment.
③For projects involving hazardous waste, hazardous waste should be more detailed: first, whether the production link, amount and type of hazardous waste are consistent with the environmental assessment, whether there are omissions in the environmental assessment; whether the capacity of the hazardous waste storage site (facility) is Meet the storage and turnover requirements of hazardous waste generation.
Hazardous waste prevention and control measures: Whether the construction area and location of the temporary storage room for hazardous waste meet the requirements, and whether the construction of the temporary storage room meets the "Hazardous Waste Storage Pollution Control Standard" (GB 18597-2001) and the relevant requirements in the standard amendment. See below for specific requirements.
Short comment: Xuheng also provides leak lock plug for refurbishing old barrels. If you have purchase requirements, please contact us.
SMS Believes Investment in US And Indian Steel Mills Will ContinueJuly 1, 2022Plant builder SMS group anticipates the political framework in the USA and India will keep facilitating investment in metallurgical plants."Many customers are currently reviving projects that had...view
Global Shipping System Under The Impact Of The EpidemicJune 30, 2022What has happened to the global shipping system under the impact of the epidemic?1. "Crazy" shipping priceIn the winter of novel corona virus pneumonia, besides the hot vaccine industry, the...view
Matters Needing Attention In The Use Of Iron DrumsJuly 4, 2022While making great efforts to innovate, iron drum manufacturers have also discovered many incorrect operation methods, which are not conducive to the long-term use of iron products. Let’s take a look...view
Vale's Chief Executive Says Iron Ore Is Not In A SupercycleJuly 1, 2022Iron ore is not starting a new supercycle, according to Vale chief executive Eduardo Bartolomeo. In a FinancialTimes interview, the ceo estimates that demand will level off in two years.Bartolomeo say...view